Delivery Times & What to Expect
Because our blinds, shutters and soft furnishings are made specifically for your home, delivery and installation times differ from standard off-the-shelf products. Every order is manufactured only after the final survey and specification have been completed and confirmed.
- Made-to-measure products manufactured specifically for your home
- Realistic lead times confirmed before ordering
- Professional measuring and installation by our own team
- Regular updates if a delay affects your order
- Faster-turnaround shutter options available on selected ranges
We always aim to provide realistic expectations. However, because some products rely on specialist manufacturing, fabric supply and international transport, lead times can occasionally vary.
Why Made-to-Measure Products Take Longer
Made-to-measure blinds and shutters are not taken from standard warehouse stock. They are manufactured specifically for your windows using the final measurements, materials, colours and operating systems agreed during your consultation and survey.
- Each product is manufactured specifically to fit your window opening
- Materials, colours and control options are selected specifically for your order
- Final measurements are confirmed during the survey process
- Manufacturing begins once the specification has been fully agreed
- Products are checked before being prepared for installation
- Installation is then arranged with our fitting team
Because products are individually manufactured rather than adapted from standard stock, lead times are normally calculated from the point at which the final survey and specification have been completed, rather than from the initial deposit payment.
Made-to-measure products are manufactured to carefully controlled fitting tolerances so they operate correctly and fit properly within the window or recess. This process helps ensure the finished product performs as intended and suits your home, rather than being a standard product adjusted after purchase.
Typical Lead Times for Made-to-Measure Blinds
For most standard made-to-measure blinds, our typical lead time is currently around 3 to 5 weeks from final survey and confirmation of specification. This applies to the majority of our core blind ranges.
- Roller blinds: typically 3 to 5 weeks
- Day and night blinds: typically 3 to 5 weeks
- Vertical blinds: typically 3 to 5 weeks
- Wooden Venetian blinds: typically 3 to 5 weeks
- Faux wood Venetian blinds: typically 3 to 5 weeks
- Aluminium Venetian blinds: typically 3 to 5 weeks
- Pleated blinds: typically 3 to 5 weeks
Motorised blind options may vary depending on the blind type, motor system, components and specification selected.
Lead times are based on final survey and specification approval rather than the initial deposit payment.
Your expected lead time will be confirmed on your order documentation based on the products selected and the current supplier position at the time of ordering.
UK-Made Shutter Lead Times
Our UK-made shutter range offers a more local manufacturing option for customers who want a faster-turnaround and more sustainable alternative to longer international supply routes.
Under normal conditions, our UK-made shutters are currently expected to take around 4 to 5 weeks from final survey and confirmation of specification.
- Typical lead time: approximately 4 to 5 weeks
- Manufactured in the UK rather than imported from overseas
- Travels approximately 107 miles to our warehouse instead of around 17,000 miles from China
- Reduced transport distance can help simplify supply and reduce shipping-related disruption
- A strong option where sustainability and turnaround time are priorities
UK-made shutters are not usually the lowest-cost option, as UK manufacturing costs are generally higher. However, they can offer important advantages in lead time, supply-chain simplicity and reduced transport distance while still providing a fully made-to-measure shutter solution.
Lead times are based on final survey and specification approval rather than the initial deposit payment.
European-Manufactured Plantation Shutters
Selected European-manufactured plantation shutter ranges can currently be supplied more quickly than many standard imported shutter options. This can be particularly beneficial where a shorter turnaround is important, especially as white remains the most popular plantation shutter colour.
Under normal conditions, selected white shutter ranges are currently expected to take around 4 to 5 weeks from final survey and confirmation of specification.
- Typical lead time: approximately 4 to 5 weeks
- European-manufactured shutter ranges available on selected options
- Popular white finishes often available with faster turnaround
- Useful where installation timing is a priority
- Alternative colours and specialist finishes may follow different manufacturing routes
Availability depends on the exact shutter range, colour and specification selected at the time of ordering. If lead time is an important factor, we can explain which plantation shutter options currently offer the best balance between appearance, quality and turnaround.
Lead times are based on final survey and specification approval rather than the initial deposit payment.
Imported Plantation Shutter Lead Times
Plantation shutters generally require longer lead times than blinds because they are precision-manufactured to suit each individual window, frame layout and panel configuration. Most of our imported shutter ranges are manufactured overseas before being shipped into the UK for installation.
Under normal conditions, our typical expectation for imported plantation shutters is currently around 10 to 12 weeks from final survey and confirmation of specification.
- Standard imported plantation shutters: typically around 10 to 12 weeks
- Specialist colours or configurations may require additional manufacturing time
- Shaped shutters generally take longer because of the additional production involved
- Faster-turnaround options are available on selected shutter ranges
Because imported shutters rely on international manufacturing and shipping routes, global events can occasionally affect lead times after an order has been placed. Changes affecting international shipping routes and freight movement have shown how quickly transport conditions can vary.
Imported plantation shutters may travel around 17,000 miles from China before reaching our warehouse, so international shipping conditions can sometimes affect delivery schedules during the manufacturing and transport process.
While we always aim to provide realistic expectations based on current supplier information, longer lead-time products can occasionally be affected by changing global conditions during manufacturing and transport. If delays occur, we will always aim to keep you informed as early as possible.
Lead times are based on final survey and specification approval rather than the initial deposit payment.
Lead Times for Curtains and Soft Furnishings
Made-to-measure curtains and soft furnishings generally require longer lead times than most standard blind ranges because of fabric sourcing, specialist manufacturing and lining requirements.
At present, we would typically expect a minimum lead time of around 5 weeks from final survey and confirmation of specification for most soft furnishing orders. However, ongoing disruption affecting international shipping routes in the Middle East is currently adding approximately an additional 2 weeks to many fabric and soft furnishing lead times.
- Typical minimum lead time: approximately 5 weeks
- Current additional lead time: typically around 2 extra weeks
- Fabric availability can affect individual timescales
- Specialist linings, interlinings and custom finishes may require additional time
- Lead times can vary between fabric suppliers depending on availability and shipping conditions
Because fabric supply and international transport conditions can change quickly, we will always aim to provide the most realistic lead time available at the point of ordering and keep you informed if supplier information changes.
Lead times are based on final survey and specification approval rather than the initial deposit payment.
Why Lead Times Can Change
Lead times can occasionally change because made-to-measure products rely on manufacturing capacity, component availability, fabric supply and transport routes. Events around the world can sometimes affect these factors with little notice.
- Material and fabric availability can change
- Manufacturing schedules can vary during busy periods
- International shipping conditions can affect imported products
- Specialist products may require additional production time
- Supplier updates can occasionally change after an order is placed
If we become aware of a delay affecting your order, we will aim to keep you informed as early as possible.
How We Keep You Informed
We understand that customers want clear expectations once an order has been placed. Your expected lead time will be confirmed on your order documentation, and we will update you if we become aware of any significant change affecting your order.
- Expected lead times confirmed before manufacturing begins
- Order documentation shows the anticipated timescale
- Updates provided if supplier information changes
- Installation arranged once products are ready
- Our team remains available if you have questions during the process
Our aim is to be realistic, transparent and proactive, so you understand what to expect from final survey through to installation.
Choosing the Right Product for Your Timescale
If you have a preferred installation date or need products within a particular timeframe, please let us know as early as possible. We can then guide you towards the most appropriate options based on current lead times.
- Standard blinds are usually the fastest made-to-measure option
- Soft furnishings may currently require additional time
- Some shutter ranges offer faster turnaround than others
- UK-made shutters may reduce transport-related delays
- Selected white shutter options may be available more quickly
We will always advise honestly if a particular product is unlikely to meet your required timescale.
Frequently Asked Questions
Why do plantation shutters take longer than blinds?
Plantation shutters are precision-made specifically for each individual window, including the frame layout, panel configuration and louvre size. Because they are manufactured to order rather than taken from stock, they generally require longer lead times than most standard blind products.What are your current lead times for made-to-measure blinds?
For most standard made-to-measure blinds, our typical lead time is currently around 3 to 5 weeks from receipt of deposit. This applies to many of our core ranges including roller blinds, vertical blinds, Venetian blinds and pleated blinds.Why can lead times sometimes change?
Lead times can occasionally change because made-to-measure products rely on manufacturing schedules, material availability and shipping conditions. International events affecting freight and supply routes can sometimes impact imported products after an order has already been placed.How long do imported plantation shutters usually take?
Under normal conditions, imported plantation shutters are currently expected to take around 10 to 12 weeks from receipt of deposit. Specialist colours, shaped shutters and custom configurations may require additional time.Do you offer faster-turnaround plantation shutters?
Yes. Selected European-manufactured and UK-made shutter ranges can currently offer significantly faster lead times than many imported shutter options, depending on the colour and specification selected.How long do UK-made shutters usually take?
Our UK-made shutter ranges are currently expected to take approximately 4 to 5 weeks from receipt of deposit under normal conditions.Are white plantation shutters available more quickly?
Often, yes. Selected white plantation shutter ranges can currently be supplied more quickly than many alternative colours because they are produced on faster-turnaround manufacturing routes.Why do curtains and soft furnishings sometimes take longer?
Curtains and soft furnishings can be more affected by fabric availability, specialist manufacturing and international shipping conditions. Current lead times are typically longer than standard blind ranges and may vary between fabric suppliers.Will you tell me if my order is delayed?
Yes. If we become aware of delays affecting your order, we will always aim to keep you informed as early as possible and provide the most up-to-date information available from the supplier or manufacturer.Are your products made specifically for my windows?
Yes. Our blinds and shutters are made to measure for your home using the measurements, materials, colours and specifications agreed during your consultation.
